Product General Information:
Place of Origin: | China |
Brand Name: | Jiangsu Xinhe Machinery |
Model Number: | Door Panel Production Line |
Product Business Terms:
Minimum Order Quantity: | 1 |
ProductionTime: | 45 days |
Payment Terms: | LC T/T |
Description:
The production line adopts specially designed SJZ92 conical twin-screw extruder, adopts frequency conversion start, imported brand temperature control instrument, with a wide speed range, high temperature control precision, easy and reliable operation. The auxiliary machine is composed of vacuum setting table, drawing machine, cutting machine and stacking rack. Equipped with a large forced cooling device to ensure the shaping effect of the plate. Crawler tractor adopts precision gear motor and frequency converter, which has the advantages of reasonable structure, large traction force and stable traction. The cutting machine has the advantages of reliable and accurate work and high cutting precision. The stacking frame is made of aluminum roller structure, which has the advantages of no material damage and easy to use. Auxiliary set adopts PLC system, the whole machine control is reliable and stable.
Specifications:
Model | Material | Extruder Model | Product width(mm) | Output(kg/h) | Main motor power(kw) |
YF-800 | PVC | SJZ80/156 | 800 | 200-350 | 55 |
YF-1000 | PVC | SJZ80/156 | 1000 | 400-600 | 132 |
YF-1250 | PVC | SJZ92/188 | 1250 | 400-600 | 132 |
Application:
Q11.Where is your technical support team located?
A11.Our technical support team is located in China, Vietam, Indonesia.but we provide remote support worldwide to meet customers from all over the world.
Q12.Does the device support multi-language operation interface?
A12.Yes, our devices support multi-language operation interface, including English, Spanish, French, etc.This is more suitable for PLC Parts.
Q13.Does the equipment comply with international safety standards?
A13.Yes, our equipment complies with international safety standards such as CE, ISO, Besides we have Patented Certificate etc.
Q14.How long does it take to install the equipment?
A14. Installation time depends on the equipment model and site conditions, usually takes 1-2 weeks. Before our technicians arrive , we suggest customers prepare water , electric , gas well which can save more time . As a result, we have more time in machine production.
Q15. Does the device require special power configuration?
A15.Yes, specific power requirements can be found in the technical specifications.At the same we can customize motor according to customer local .
Copyright © Jiangsu Xinhe Intelligent Equipment Co., Ltd. All Rights Reserved